Album - 2001 Slam Dunk Arcade Machine

This is in for some new red laminate on the left side and gluing what has lifted on the other sides.

Update: Red vertical-grade laminate has been ordered (it won't match, but it should be close). The broken and pulled-away laminate from the left side has been removed (what a pain)—some wood filler and sanding prep for the new laminate. Laminate has been applied to the left side and routed. Looks great!

There is enough leftover laminate. So I decided to do the one panel on the backside as well. The rest that is peeling will get glue.

Completed and turned out great!

To be replaced
Upper to be glued
Middle to be replaced
Lower to be glued
Side to be glued
Scraping
Being Stubborn
Wood Filler Time
Laminate Cut
Test Fit
Routing a Straight Edge
Ready for Glue
Glue Applied
Waiting to Cure
Glue Applied
Waiting to Cure
Routing Done
Routing Done
Peeling
Peeling
Peeling
Peeling
Peeling
Missing
Peeling
Squaring Up
Squared and Glued
Break Time
Too Hot in the Shop
Done
Done
Done
Done
Done
Done
Done
Done